This project involved the refurbishment of a 927 m2 two storey office building.

Cooper House

This project involved the refurbishment of a 927 m2 two storey office building.

Cooper House

Project outline

This project involved the refurbishment of Cooper House, a 927 m2 two storey office building in Coventry. The building was heated by a low temperature hot water system using perimeter radiators and cooled using indoor fan coil units connected to external Daikin air conditioning systems.

Project outcomes

The project included the safe removal of R22 refrigerant from the building’s air conditioning systems and replacement of the external R22 condensing units for R410 systems. The air conditioning units were manufactured by Daikin and replaced using their VRV-Q products. The indoor fan coil units were tested and retained resulting in significant savings in capital expenditure during the refurbishment programme. The project also included the reinstatement, measurement and repairs to the existing building services systems.

Project Summary

–– Services ––

  • Specification documents

  • Scope of work documents

  • Checking duties


–– Sector ––

  • Offices

Related projects

Eagley Infant School

This involved the replacement of the school heating system including all associated controls, pumps and pressurisation plant, pipework and emitters, and fan convectors.

Clifford Whitworth Library

This project involved a three-storey library building which was constructed in 1971 and extended in 1990.

St. Benedict's Primary School

Kelly & Knight provided mechanical and electrical designs for the refurbishment and extensions of the classrooms. 

Get in touch to discuss how Kelly & Knight can help with your next project.

bottom of page