top of page
KellyKnight_Logo_Blue.png
uni2.jpeg

Kelly & Knight has over a 
decade of experience delivering mechanical & electrical engineering services to the highest standards.

Our projects

We’re proud to have delivered a range of projects across our services for many clients:

Higher Education

Energy House 2.0

Kelly & Knight were approached to design the rain water and snow simulation equipment for this new state- of- the- art research facility.

Higher Education

Clifford Whitworth Library

This project involved a three-storey library building which was constructed in 1971 and extended in 1990.

Education

St Matthews School, Oldham

This project included the replacement of the existing boiler heating system, the gas fired hot water generator and several classroom fan convectors.

Offices

Cooper House

This project involved the refurbishment of Cooper House in Coventry, a 927 m2 two storey office building.

Higher Education

Cockcroft Building

The requirements were for a detailed survey of the existing building services and to produce detailed drawings including schematics to update existing plans.

Education

St. Benedict's Primary School

Kelly & Knight provided mechanical and electrical designs for the refurbishment and extensions of the classrooms. 

Arts Facility

Peel Building

This local project involved assessing and reducing the external noise entering the performance area of a Victorian Arts Facility based in Salford.  

Education

Eagley Infant School

This involved the replacement of the school heating system including all associated controls, pumps and pressurisation plant, pipework and emitters, and fan convectors.

Higher Education

MediaCityUK - University of Salford

Salford University’s Media City Campus is based within the Orange Building and has radio broadcasting facilities at level 3.

Get in touch to discuss how Kelly & Knight can help with your next project.

bottom of page