The requirements were for a detailed survey of the existing building services and to produce detailed drawings including schematics to update plans.

Cockcroft Building

The requirements were for a detailed survey of the existing building services and to produce detailed drawings including schematics to update plans.

Cockcroft Building

Project outline

The requirements were for a detailed survey of the existing building services and to produce detailed drawings including schematics to update existing plans. The academic laboratory facility was originally constructed in 1965 and since this date has undergone significant refurbishment programmes.

Project outcomes

The works included the refurbishment of the existing dual duct ventilation system, upgrade of fans and associated motors, commissioning of systems and the production of detailed ‘As Fitted’ information.

Project Summary

–– Services ––

  • Specification Documents

  • Design & Drawings


–– Sector ––

  • Higher Education

Related projects

Cooper House

This project involved the refurbishment of Cooper House in Coventry, a 927 m2 two storey office building.

Eagley Infant School

This involved the replacement of the school heating system including all associated controls, pumps and pressurisation plant, pipework and emitters, and fan convectors.

Clifford Whitworth Library

This project involved a three-storey library building which was constructed in 1971 and extended in 1990.