Kelly & Knight were approached to design the rain water and snow simulation equipment for this new state- of- the- art research facility.

Energy House 2.0

Kelly & Knight were approached to design the rain water and snow simulation equipment for this new state- of- the- art research facility.

Energy House 2.0

Project outline

Kelly & Knight were approached to design the rain water and snow simulation equipment for this new state- of- the- art research facility. The research facility consists of two large environmental chambers which are designed to control and simulate external weather conditions so that construction materials (and appliances) can be tested under differing climatic conditions and wind velocities. There are several options for property types which may be constructed within the test facility ranging from apartment buildings to semi and detached houses. The chambers are climatically controlled, and temperatures can range from -20°C to +40°C.

Project outcomes

This project involved the installation of new water and boosted services from third floor level (+10.2 metres minimum) to ground floor level so that specialist rain and snow making equipment can be connected in each chamber by the end user. In addition, the design also included the design and selection of a process chilled water machine to produce snow.

Project Summary

–– Services ––

  • Design & Drawings


–– Sector ––

  • Higher Education

Related projects

Cooper House

This project involved the refurbishment of Cooper House in Coventry, a 927 m2 two storey office building.

Eagley Infant School

This involved the replacement of the school heating system including all associated controls, pumps and pressurisation plant, pipework and emitters, and fan convectors.

Clifford Whitworth Library

This project involved a three-storey library building which was constructed in 1971 and extended in 1990.