An existing boiler heating system replacement, gas-fired hot water generator & several classroom fan convectors.

St Matthews School, Oldham

An existing boiler heating system replacement, gas-fired hot water generator & several classroom fan convectors.

St Matthews School, Oldham

Project outline

This project included the replacement of the existing boiler heating system, the gas fired hot water generator and several classroom fan convectors. The previous heating system comprised two Hamworthy gas fired boilers each rated at 120 kW.

Project outcomes

The existing boilers were replaced by two new Ideal EVOMAX condensing boilers, each new boiler being rated at 120 kW with primary circulation pumps and low loss header. The existing feed and expansion tank was removed and replaced by a pressurisation and expansion system. The primary heating pipework within the plant room was replaced as were the potable water and gas services. New circulation pumps were installed. The heating control systems (BMS) was replaced in its entirety for new. The heating circuits were recommissioned based upon 80° C flow temperature and 60 C return.

Project Summary

–– Services ––

  • Design & Drawings

  • Checking Duties

–– Sector ––

  • Education

Related projects

Cooper House

This project involved the refurbishment of Cooper House in Coventry, a 927 m2 two storey office building.

Eagley Infant School

This involved the replacement of the school heating system including all associated controls, pumps and pressurisation plant, pipework and emitters, and fan convectors.

Clifford Whitworth Library

This project involved a three-storey library building which was constructed in 1971 and extended in 1990.

Get in touch to discuss how Kelly & Knight can help with your next project.

bottom of page